Sign In | Join Free | My enlightcorp.com
China Xian TianRui Petroleum Machinery Equipment Co., Ltd. logo
Xian TianRui Petroleum Machinery Equipment Co., Ltd.
Verified Supplier

1 Years

Home > Mud Cleaning System >

Maximize Efficiency and Minimize Waste with a Mud Cleaning System for Drilling and Construction Projects

Xian TianRui Petroleum Machinery Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Maximize Efficiency and Minimize Waste with a Mud Cleaning System for Drilling and Construction Projects

Brand Name : TR Solids Control

Model Number : TRHDD-1000GPM

Certification : API / ATEX / IEC / ISO9001

Place of Origin : Xi'an,China

Price : USD 275-45800 or Negotiable

Capacity : 1000GPM(240 m³/h)

Shale shaker : TRZS584

Mud cleaner : TRQJ250×2S-100×12N

Feed pump : TRSB8×6-11J

Mud agitator : TRJBQ7.5

Total; power : 184KW

Contact Now

Revolutionizing Drilling Operations with Closed-Loop Mud Management

As global environmental regulations tighten (EU Directive 2024/017 on drilling waste), mud recycling systems have become indispensable for modern tunneling and drilling projects. Our cutting-edge system achieves 92% mud reuse rate while reducing carbon emissions by 4.8 tons per 10,000m³ processed - equivalent to planting 260 trees.

Patented Multi-Stage Purification Process

  1. Precision Solid Control

    • Shale Shakers: Remove 85% of >75μm particles at 5G vibration intensity

    • Hydrocyclone Array: 3-stage desanders/desilters eliminate 20-74μm solids

    • Decanter Centrifuge: Nano-level separation down to 5μm particles

  2. Smart Fluid Recovery

    • IoT-enabled viscosity sensors maintain optimal mud weight (8.5-9.5ppg)

    • Automated chemical dosing system adjusts pH value in real-time

    • Cloud-based performance monitoring with 98.7% data accuracy

Global Application Cases

Project Type

Achievement

Location

Arctic HDD -58°C operation, $2.1M cost savings Yamal LNG Project
Urban TBM Zero waste discharge in 36 months Shanghai Metro Line 24
Deepwater Drilling 40% fewer NPT events Gulf of Mexico

Competitive Advantages

Modular Design: 8-hour deployment with 20ft container compatibility
Energy Efficient: 0.38kWh/m³ power consumption (industry avg: 0.52kWh/m³)
Certifications: API 13C, ISO 14001, and CE compliant


Product Tags:

mud cleaning system for drilling

      

efficient mud cleaning system

      

construction waste minimization system

      
Quality Maximize Efficiency and Minimize Waste with a Mud Cleaning System for Drilling and Construction Projects for sale

Maximize Efficiency and Minimize Waste with a Mud Cleaning System for Drilling and Construction Projects Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xian TianRui Petroleum Machinery Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)